Portal de Murcia

www.portaldemurcia.com

Murcia - SpanishMurcia - English
detail of Murcia

 

A step towards the construction of three solar parks at Gea y Truyols, Jerome and Avileses and Sucina (20/05/2009)

The Governing Board has awarded the project definitely Solnueve Energy Initiatives, Inc., formed by a consortium of eight companies in Murcia |

The hamlets of Gaia and Truyols, Jerome and Sucina Avileses and are closer to having solar farms that will prevent the emission of 36,810 tonnes / year of CO2.

The Governing Board has finally awarded the three projects to build solar farms to the company Solnueve Energy Initiatives, Inc. formed by a consortium of eight companies in Murcia.

The three plants together will lead to an installed capacity of 22.6 MW.

The energy produced is equivalent to consumption of 42% of the lamps installed in the municipality.

It is the first time is launching a project of this nature and magnitude, the result of City Council's commitment to improve the environment.

These projects include solar photovoltaic installations and small R & D & I related to solar energy, placing Murcia Spain at the forefront of renewable energy.

The municipal solar offers the City Council to develop this project are at points of very high solar radiation and with plenty of sunshine, ensuring a high energy production and cost.

The winning company has the government concession to develop and manage these projects for a period of 25 years, renewable for another 10 years.

The company will pay the City an initial fee for each installation and yearly depending on the energy produced.

The Sucina farm, located in the urbanization Peraleja is 43 hectares and 10 MW will be installed in the field.

Among the economic improvements proposed by the company is an increased charge, as proposed in the initial specification is 220,000 municipal euros (plus 16% VAT) and that under the company awarded 400,000 euros (U.S.) .

The annual fee proposed by the company is 4% of energy production, significantly improving the provisions of municipal specifications, which is 2.5%.

Moreover, burying high voltage lines in the area to reduce the visual impact will install a security system and remote on site, will build a dedicated Environmental Solar Classroom visits will be offered shares in the plant people (10%) and City Hall officials (10%), information days will be organized on the advantages of using Photovoltaic Solar Energy and organized a conference on Solar Energy and Climate Change.

Also acquire and deliver educational material related to renewable energy, will be launched loan services electric motorcycles for public use and donated 40,000 euros to the Local Agency for Energy and Climate Change.

In addition, build a solar photovoltaic installation in a city square, will be equipped with a solar heating of 300 m2 to a semi-Olympic swimming pool of the City and installed biomass boiler heating domestic support of 10 public schools.

Overall economic improvement for the project involve Sucina invest 100,000 euros and 424,000 euros in social improvements.

The project will develop Truyols Gea and on a plot of 5.6 hectares and 2.6 MW installed.

The initial fee is 35,000 euros and an annual 3% of the energy produced.

Significantly increase the proposed terms of reference of the Council.

Solnueve reduce the visual impact of the installation burying the medium voltage power lines in this plot.

Also, install a security surveillance system with cameras.

Among the social improvements proposed for this property is expected to offer shares to the public (15%) and municipal officials (5%).

In addition, a photovoltaic system will be placed in front of a public building with a value of 60,000 euros.

Also acquire and deliver educational material related to renewable energy will be donated 40,000 euros to the Local Agency for Energy and Climate Change and organized a conference on Solar Energy and Climate Change.

The winning company in this project offers economic improvements for 50,000 euros and social improvements worth 60,000 euros.

The proposed solar plant to be installed in Jerome and Avileses, Finca El Escobar, will occupy a plot of 100 hectares and will be installed 10MW.

The initial fee offered by the company is 550,000 euros and annual fee of 4% of the energy produced, significantly improving the proposal of the municipal specifications.

Solnueve burying high voltage lines on this farm to reduce the visual impact and install a security surveillance system with cameras.

In terms of social improvements, proposed the creation of a dedicated Environmental Solar Classroom visits will be offered shares in the plant to citizens (10%) and City Hall officials (10%) and organized workshops to disseminate the benefits of solar energy.

In addition, acquire and deliver educational material related to renewable energy, will be launched loan services electric motorcycles, will build a photovoltaic solar system in a town square, will be equipped with a solar heating to 300 m2 semi-Olympic swimming pool of the City and installed solar panels on the façade of a public building.

Economic improvements involving 59,000 euros and 653,000 euros social.

Source: Ayuntamiento de Murcia

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
This website uses cookies to facilitate and improve navigation. If you continue browsing, we consider that you accept its use. More information