Portal de Murcia

www.portaldemurcia.com

Murcia - SpanishMurcia - English
detail of Murcia

 

La Avenida Juan Carlos I keep one lane open in each direction while carrying out repair works of the gallery (20/01/2011)

This work will last about five weeks.

The Department of Safety and Traffic should avoid the section linking Abenarabi Avenue to the Plaza Circular seeking alternative routes in both directions

The repair of the tunnel in the Avenida Juan Carlos I, caused by an extraordinary contribution of water, have already begun.

These works, which run for about five weeks, forced to cut traffic lanes to maintain one lane open in each direction.

That is why the Department of Safety and Traffic understanding calls to drivers and should avoid the section linking Abenarabi Avenue to the Plaza Circular, on both the input and output, looking for alternative routes.

The works involve the rehabilitation of the pavement and subsoil under the platform and road tramway in Avenida Juan Carlos I, with the sanitizing of all artificial fillers and drains for the disposal running water.

After the removal of existing landfills, shall be a dual function geocomposite drainage and strengthen and extend it to wrap a geotextile drainage layer.

Among other measures, steps will be taken to minimize potential soil seats.

Source: Ayuntamiento de Murcia

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
This website uses cookies to facilitate and improve navigation. If you continue browsing, we consider that you accept its use. More information