Portal de Murcia

www.portaldemurcia.com

Murcia - SpanishMurcia - English
detail of Murcia

 

Pedestrianization works of Alfonso X Avenue will begin next summer (01/10/2016)

Councillor for Public Works, Roque Ortiz, presented to representatives of local political groups the basic project of remodeling of the avenue Alfonso X.

This document already contains various suggestions received via local or registration through the web www.fomentomurcia.es following the submission of the proposal in the public ceremony held on June 6 in the Hall of the Archaeological Museum of Murcia .

So, we have included the possibility that drivers ranging from the Plaza Circular to Santo Domingo to perform a U-turn at the junction with Jaime I.

It has also reduced the number of awnings and grouped the playgrounds front of the school Jesus Maria.

Councillor for Public Works, Roque Ortiz, announced that imminently, the basic project will be published in the BORM in municipal offices and on the website of the Department for public display for a month.

What is intended is to subject the project to a public information procedure, with final and prior to tender nature, aimed at finalizing few details or suggestions they are presented, for the timely reporting of allegations were evacuated.

They also will be installed on the avenue itself informative elements with key aspects of the project as well as the various communication channels to expose the suggestions.

Also it will forward the document to different bodies such as the Directorate General of Cultural Property to issue the corresponding reports.

Councillor for Public Works, Roque Ortiz has "encouraged to participate murcianos providing suggestions to enrich the project so that it is a result of consensus performance."

The works will be implemented in three phases of sequential action: road west (Santa Clara), road east (Santa Ana) and central promenade, allowing in this way that there are always two zones available for vehicular and pedestrian traffic.

This work plan in 3 phases minimize the effects on residents, school children, pedestrians and traffic, as well as merchants and restaurateurs.

The total estimated construction period is 8 months and the basic tender budget amounts to 2.3 million euros.

According to forecasts from December to April definitively approve the project will be tendered and the works will be hired in May so that works can begin.

Remember that the plan provides for the complete pedestrianization of Paseo Alfonso X, from his encounter with the Plaza de Santo Domingo until Jaime I, with complete renovation of the pavement and creating a uniform and modern visual space.

The plot of pavement projected a replica model is implemented in the neighboring Plaza de Santo Domingo, thereby constituting visual continuation of the same.

The essential aspect of the project will be the creation of a large space travel and pedestrian traffic along the trace marked by woodland existing bearing with maintenance of minimum essential compatible treatment and restricted to traffic, access to garages, area school and public services.

The project part of a comprehensive traffic study prepared by the Municipal Traffic Service.

This study was performed with in situ data taken with placement of coils and actual measurements (in Alfonso X, Jaime I, Santa Clara and Enrique Villar, from 12 to 19 April), so its findings are extremely reliable.

These results propose a performance pedestrianization restricted to residents, public transportation (taxis) access and loading / unloading regulated schedule.

The traffic analysis has also led to the adoption compatible with the traffic lane as one-way bike path, keeping the system existing municipal rent bikes in the area.

Pedestrianization will involve the reorganization of public space currently occupied by tables and chairs catering establishments and the largest pedestrian area resulting from the action will involve the relocation of the terraces, gaining distance from residential buildings.

In any case the project will increase the space currently occupied by the terraces.

The project involves the placement of various shade awnings, fostering a more welcoming and pleasant stay for the ride and space.

The placement is provided by an anchoring system in new lights, so as to be movable and adaptable to the various seasons or seasons.

The project involves the replacement of all existing containers for the installation of underground facility and the installation of various banks stay around landscaped, similar to those in Plaza Santo Domingo spaces.

Source: Ayuntamiento de Murcia

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
This website uses cookies to facilitate and improve navigation. If you continue browsing, we consider that you accept its use. More information