The Department of Public Works will carry out paving of sidewalks and driveways in the Street Morera by the CEIP James.
On this street, the main road in the neighborhood of Santiago El Mayor where there is a significant volume of traffic both vehicular and pedestrian, the necessary work will be done for the layout of the street has continuity with its slopes to the sidewalks where they collected water rain along the curbs.
Also the sidewalks will run from existing next to the school to connect with existing street Delicias, and the road will be paved by creating a service road between the main street and sidewalks, in which two bands of parking will be set up in line.
The cost of these works, which made Asfaltos Jaen, more than 54,000 euros and the execution period is four months
Source: Ayuntamiento de Murcia