Portal de Murcia

www.portaldemurcia.com

Murcia - SpanishMurcia - English
detail of Murcia

 

Era Era will have an area covered with children's games adapted for children with reduced mobility (19/05/2017)

The Governing Board today approved two projects to improve the green areas of districts: the renovation of the garden of the Avenue of the Constitution in Sangonera la Seca and the new garden area of ​​the Old Path of Badén de Era Alta.

The first project consists of the extension of the existing garden with the creation of a central cobblestone corridor and the planting of palms and shrubs.

In addition, a dyeing system will be installed, new urban furniture will be installed and the irrigation network will be improved.

The maximum price of these works is 92,781 euros and the execution period of 3 months.

As for the new children's play area of ​​Era Alta, it will occupy an area of ​​about 300 square meters and will have integration spaces for children with reduced mobility.

A cover pergola will also be installed to minimize the effects of the sun and the area will be fenced and covered with rubber pavement, improving the ornamentation and safety of the playground.

In this space will be installed games for all ages, with integration elements for children with reduced mobility and sound and visual sensory stimulation elements, such as timbales, trampoline or telephones, as well as those installed in the Garden of Silk .

The maximum price of these works is 70,852 euros and the execution period of two months.

Source: Ayuntamiento de Murcia

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
This website uses cookies to facilitate and improve navigation. If you continue browsing, we consider that you accept its use. More information